CMP317, CMP327, CMP332 & CMP333 – decision on urgency

Read More..

Re: Connection and Use of System Code (CUSC) Modification Panel Request

for Urgency and Recommended Timetables, for:

– CMP327 ‘Removing the Generator Residual from TNUoS Charges (TCR)’ and CMP317 ‘Identification and exclusion of Assets Required for Connection when setting Generator Transmission Network Use of System (TNUoS) charges’

– CMP332 ‘Transmission Demand Residual bandings and allocation (TCR)’

– CMP333 ‘BSUoS – Charging Supplier Users on gross demand (TCR)’

On 2 December 2019 Ofgem received a request on behalf of the CUSC Panel for urgency for CMP327 and CMP317. On 19 December 2019 Ofgem received similar requests for CMP332 and CMP333.

Following consideration of these requests, we have decided not to grant urgency to these modification proposals at this time