Home page

  • SECMP122A- Operational Metrics
    The SEC Panel Operations Group commissioned the Operational Metrics Review to better understand the DCC’s Performance Measurement Report (PMR) measures, to consider amendments and recommend new reporting metrics, which more accurately reflects the business processes that the DCC supports. The Proposed solution is for the DCC to facilitate the necessary changes to the DCC System in order to implement and […]
  • SECMP0007- Firmware updates to IHDs and PPMIDs
    Currently Over-The-Air firmware updates via the DCC can only be made to the Communications Hub, Electricity Smart Metering Equipment (ESME) and Gas Smart Metering Equipment (GSME). This modification will address the lack of capability to update firmware for other mandated Home Area Network Devices, specifically Prepayment Meter Interface Devices (PPMIDs) and HAN Connected Auxiliary Load Control Switches (HCALCSs).
  • Viking Energy Wind Farm LLP- Notice of grant of an electricity generation licence
    NOTICE UNDER SECTION 6A(5) OF THE ELECTRICITY ACT 1989 OF THE GRANT OF AN ELECTRICITY GENERATION LICENCE The Gas and Electricity Markets Authority (“the Authority”) hereby gives notice pursuant to section 6A(5) of the Electricity Act 1989 (“the Act”) that on 27 October 2020 an electricity generation licence was granted under section 6(1)(a) of the Act to Viking Energy Wind […]
  • Viking Energy Windfarm LLP- Notice of grant of an electricity generation licence
    NOTICE UNDER SECTION 6A(5) OF THE ELECTRICITY ACT 1989 OF THE GRANT OF AN ELECTRICITY GENERATION LICENCE The Gas and Electricity Markets Authority (“the Authority”) hereby gives notice pursuant to section 6A(5) of the Electricity Act 1989 (“the Act”) that on 27 October 2020 an electricity generation licence was granted under section 6(1)(a) of the Act to Viking Energy Wind […]
  • SECMP067 – Service Request Traffic Management
    SEMP0067 was rejected by the Authority, it sought to introduce a mechanism to regulate the volume of SRs when the DCC System is experiencing unexpected heavy traffic. This functionality would have been activated if the DSP system capacity threshold is breached, and would only occur in exceptional circumstances.
  • Consultation on changes to the Gas Network Innovation Competition Governance Document version 3.0
    This notice explains our proposed changes to the Gas Network Innovation Competition (NIC) Governance Document version 3.0. This notice is issued under a number of licence conditions. These are: Special Condition 2F of the Gas Transporters Licence for National Grid Transmission Special Condition 1I of the Gas Transporters Licence for Distribution Network Operators Representations on the proposed modifications must be […]